ECOCITY
Services

What ECOCITY
delivers on real sites.

Five service lines, one deployment model. ECOCITY supports municipalities, institutions, and development partners from site selection to installed corridor — and measures the result.

Service lines

Five ways to deploy.

Each service line is specified, priced, and scoped independently. Partners mix and match to fit the site, the budget, and the political calendar.

01 · Walkways
Urban infrastructure

Urban Walkway Systems

ECOCITY replaces degraded sidewalks and pedestrian corridors with modular composite pavement.

Urban Walkway Systems

ECOCITY replaces degraded sidewalks and pedestrian corridors with modular composite pavement.

  • Site audit & specification
  • Composite paver supply
  • Install supervision
  • Public communication assets
02 · Drainage
Water management

Drainage & Edge Infrastructure

ECOCITY installs kerb and edge systems to organize water flow and strengthen streetscape geometry.

Drainage & Edge Infrastructure

ECOCITY installs kerb and edge systems to organize water flow and strengthen streetscape geometry.

  • Corridor drainage review
  • Edge-system supply
  • Flood-resilience retrofit
  • Flow-pattern documentation
03 · Institutional
Compound upgrades

Institutional Surface Upgrades

ECOCITY re-surfaces schools, health centers, and compounds with modular blocks and slabs.

Institutional Surface Upgrades

ECOCITY re-surfaces schools, health centers, and compounds with modular blocks and slabs.

  • Compound surface audit
  • Phased install scheduling
  • Modular block supply
  • Maintenance handover
04 · Pilot programs
Pilot support

Pilot & Demonstration Support

ECOCITY builds site-specific demonstration corridors for municipalities, funds, and resilience programs.

Pilot & Demonstration Support

ECOCITY builds site-specific demonstration corridors for municipalities, funds, and resilience programs.

  • Pilot-site selection
  • Custom component design
  • Before/after documentation
  • Impact reporting package
05 · Deployment
Full pathway

End-to-End Deployment Support

ECOCITY manages the full pathway from signed intent through installed corridor and measured outcomes.

End-to-End Deployment Support

ECOCITY manages the full pathway — from signed intent through installed corridor and measured outcomes.

  • Project management
  • Procurement support
  • Quality assurance
  • Public reporting
Deployment model

From signed intent
to installed corridor.

Four stages. Clear decision points. No ambiguity on what happens in each quarter.

Q1 · Now

Site selection

Identify corridor, stakeholders, and proof outcomes. Sign a pilot agreement with measurable success criteria.

Q2

Specification & supply

Engineer the product mix for the site. Lock in waste-stream sourcing. Confirm the install schedule.

Q3

Install & document

Deploy pavement, capture before/after, produce public communication for city and partner channels.

Q4 → Year 2

Measure & scale

Track durability, cost savings, and plastic diverted. Convert pilot into repeat procurement and second-site rollout.

Impact — before / after

The transformation
is a site, not a slide.

Drag to compare. Same corridor, same footprint — one on legacy surface, one rebuilt with ECOCITY composite.

Before
After
◂ ▸
Impact — per 1,000 m²

The math that
moves procurement.

Performance is measured, not claimed. These numbers move tender reviews, climate-finance committees, and council votes.

Plastic diverted
0tons

Recovered plastic converted into installed pavement per 1,000 m² of block application.

CO₂ avoided
0t / ton

Emissions avoided per ton of product versus conventional cement-heavy pavers.

Compressive strength
>0MPa

Meets infrastructure specification for pedestrian and light-vehicle load.

Water absorption
<0%

Low porosity means durable in monsoon-exposed corridors and flood-prone sites.

Cost vs. conventional
-0%

Procurement saving against conventional paving on comparable specifications.

Design life
0yrs

Long-duration performance with unit-level replacement — no full-surface re-pour.

Informal collectors
00/ city

Informal waste collectors integrated into ECOCITY supply chains per city deployment.

Green jobs
Thousands

Collection, sorting, processing, and installation roles across the ECOCITY value chain.

Implementation roadmap

From lab-verified
to city-scale.

Five milestones move ECOCITY from pilot validation to institutional procurement. Partners can engage at any stage and contribute to the one ahead.

I

Pilot endorsement

Environmental and technical validation from recognized partners on a real corridor.

II

Standard testing

Certification against Ethiopian and international infrastructure specifications.

III

Government integration

Integration into municipal pilot programs and facilitated land for scale-up.

IV

NGO & IGO partnership

Partnership with NGOs and inter-governmental institutions for co-financing and scale.

V

Technology transfer

Provide technology, production, installation, and capacity-development pathways.

Why partners choose ECOCITY

Three value dimensions.
Measured on every deployment.

01

Circular economy value

Every square meter installed diverts kilograms of plastic from landfill and waterways. Waste becomes balance-sheet asset, not disposal cost.

02

Climate adaptation value

Low-absorption surfaces, organized drainage, and low-carbon material pathways — built for monsoon-exposed and heat-stressed urban corridors.

03

Municipal & institutional value

Visible public-space improvement, procurement cost savings, and measurable impact reporting for councils, donors, and resilience programs.

Start a deployment

Fund a corridor.
Build a case study.

ECOCITY partners with municipalities, institutions, and climate-focused investors ready to move from commitment to installed infrastructure within two quarters.

💬 📞